Tag Archives: Lower Plenty Road

Melbourne, Victoria: Another sep forward with AUD 395 million project

8 Feb

The design for a rail-over-road bridge within the AUD 395 million project which will also deliver doubling  of the railway along the Hurstbridge Line corridor and reconstruction of the Rosanna station reconstruction has been finalised. The elimination of the Grange Road level crossing in Alphington is also included within this project

The new rail-over-road bridge will eliminate the Lower Plenty Road level crossing in Rosanna which has long antagonised road users with the traffic congestion attributable to the level crossing at which the barriers can be down 43 minutes in the hour at peak times..

The project is scheduled for completion in 2019