Wareham, Dorset, UK: Crossing stand-off continues

14 Apr

The footpath level crossing just metres away from the town’s station continues to generate passion whether for or against eliminating the level crossing.

Despite regulator ORR slapping an improvement notice on Network Rail and Dorset County Council in 2010 to address risk at one of the country’s least safe level crossings, hundreds of people have signed a petition calling for the retention of this level crossing. Meanwhile Network Rail has improved matters on a ‘temporary basis by installing a locking gate and posting an attendant at the crossing. Even with these controls overlaid onto a crossing equipped with warning lights and audible alarms, Network Rail still maintains its position that the crossing needs to be eliminated on safety grounds as misuse is still being reported..

The permanent solution proposed by Network Rail was a ramped access footbridge to replace both this level crossing and the footbridge at the station just metres away. This solution was last year turned down by Purbeck District Council on the grounds that it was too large and increased walking time expected of pedestrians.

Now Dorset County Council and Network Rail are looking at further options.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: